Search
BOR | 2013
The San Joaquin River Restoration Program is a comprehensive long-term effort to restore flows to the San Joaquin River in California’s Central Valley from Friant Dam to the confluence of the Merced…
BOR | 2013
Reclamation is responsible for administration of the Operating Criteria and Procedures (OCAP) for the Newlands Reclamation Project, Nevada. Section 418.8 of OCAP directs Reclamation and the Truckee-…
BOR | 2013
Reclamation is charged with measuring consumptive water use (water that is physically removed, either through export or evaporation) within the Upper Colorado River Basin. Irrigated agriculture…
OSM | 2013
The OSMRE Alton Field Division (AFD) inspectors have been working with Kamiliah Lograsso, a physical scientist in the OSMRE Mid-Continent Regional (MCR) office Program Technology Support Branch (PTSB…