Search
BOR | 2016
BOR performs dam failure inundation modeling and mapping in support of emergency evacuation planning and dam safety risk analysis. Interferometric Synthetic Aperture Radar (IFSAR), lidar, and other…
BOR | 2016
The Colorado River is the principal source of water for irrigation and domestic use in Arizona, southern California, and southern Nevada. To account for water use by each State or individual and to…
BOR | 2016
Colorado River Delta - Water For the Environment and Environmental Benefits First-ever plans to facilitate and promote actions that foster environmental benefits in the Colorado River Delta were set…
BOR | 2016
The BOR administers the Operating Criteria and Procedures (OCAP) to determine irrigation status for the Newlands Reclamation Project, which covers approximately 61,000 acres in Nevada. The OCAP…
BOR | 2016
The San Joaquin River Restoration Program (SJRRP) is a comprehensive, long-term effort to revive the river’s self-sustaining Chinook salmon fishery by restoring water flows to the river from the…
BOR | 2016
Underwater construction projects typically require the creation of high-resolution 3D models of existing infrastructure to retrofit equipment such as gates, valves, trashracks, or bulkheads. …
BOR | 2015
In 2012, the U.S. and Mexico signed the historic Minute 319 Agreement to improve binational water management of the Colorado River system. The agreement allowed for a one-time “pulse flow”…
BOR | 2015
The Bureau of Reclamation operates more than 300 reservoirs and 8,000 miles of water delivery canals throughout the West. Developing reservoir operation protocols and water accounting strategies…
BOR | 2015
The Colorado River is the principal source of water for irrigation and domestic use in Arizona, southern California, and southern Nevada. To account for water use by each State and individual user,…
BOR | 2015
The locations of existing and proposed water pipelines in multi-county tribal water systems in North and South Dakota are being mapped and documented in pipeline mapbooks. The 2014…
BOR | 2015
The Bureau of Reclamation administers the Operating Criteria and Procedures (OCAP) for the Newlands Reclamation Project, which monitors irrigation status of approximately 61,000 acres in Nevada. The…
BOR | 2015
The Great Plains Reclamation Dakotas Area Office (DKAO) used remote sensing imagery in a Geographic Information Systems (GIS) environment to calculate pump requirements for an irrigation system.…